Innovative Engineering Solutions, Inc.
ENERGY SERVICES


Solar & Renewable Energy Project

Location: Chester, MA

Owner: Kearsarge Barre, LLC
Host: Private Land owner
Size: 5,999 kilowatts
Number of Modules: 19,668
Number of Inverters: 10
Annual kWh produced: 5,860,000
Date Active: June 2014
Construction Start: April 2014

Innovative Engineering Solutions, Inc. (IESI) completed the Engineering, procurement and Construction for a 5,999 kW solar array for Kearsarge Energy in Chester, MA.  The property was formerly farm land that had not been used for many years.    Working closely with the local municipal light department and Western Massachusetts Electric Company, a 3-phase conductor install/upgrade from the substation was necessary to allow interconnection.  The Net Metered project was installed in 3 months start to finish, with nearly 20,000 solar modules, 12 week lead times on certain equipment and starting with a Berkshire Mountain spring that included snow on the ground, frost, then a New England muddy spring, this project was an accomplishment! 

Innovative Engineering Solutions, Inc. | Remediation | Energy Efficiency Services | Solar & Renewable Energy